Name of Contract : REHABILITATION OF PIPELINES AT MT VIEW, POLARIS & RESORT WATER SYSTEM
Location : BRGY. MT VIEW, MARIVELES, BATAAN
Approved Budget for the Contract (ABC) :THREE MILLION THREE HUNDRED THOUSAND PESOS (Php 3,300,000.00)
Contract Duration : Sixty (60) Calendar Days
Brief Description :
Rehabilitation of Pipelines at Mt. View, Polaris, Resort Bill of Quantities Brgy. Brgy. Mt View, Mariveles, Bataan |
|||||
Item No.
|
Description |
Unit |
Qty. |
Unit Price (Pesos) |
Amount (Pesos) |
1 |
Excavation, laying, & jointing of pipes & fittings, backfilling & compaction, hydrotesting, disinfection, spreading of sand bedding, thrust block, concrete breaking & surface restoration includes signages & permits |
|
|
|
|
|
|||||
|
Supply/Installation of 150 mm Ø UPVC Pipes, Class 150 (approx.), (Depth = 1 meter, Width = 0.4 meter) |
Lm |
100 |
|
|
|
Supply/Installation of 100 mm Ø UPVC Pipes, Class 150 (approx.), (Depth = 0.8 meter, Width = 0.4 meter) |
Lm |
300 |
|
|
|
Supply/Installation of 50 mm Ø UPVC Pipes, Class 150 (approx.), (Depth = 0.8 meter, Width = 0.3 meter) |
Lm |
200 |
|
|
|
Supply/Installation of CI Gate Valve M/M 100 mm Ø |
Lots |
2 |
|
|
|
Supply/Installation of CI Gate Valve M/M 50 mm Ø |
Lot |
1 |
|
|
|
Replacement of ACP Tee 6” Ø (CI Tee 150 mm M/M) |
Lots |
2 |
|
|
|
Replacement of ACP Tee 6” Ø (CI Tee 100 mm M/M) |
Lots |
2 |
|
|
|
Replacement of ACP Tee 6” Ø (CI Tee Reducer 100 mm x 50 mm M/M) |
Lots |
4 |
|
|
|
Replacement of ACP Tee 4” Ø (CI Tee 50 mm M/M) |
Lots |
3 |
|
|
|
Replacement of ACP Elbow 4” Ø w/ fittings |
Lot |
1 |
|
|
|
Demolition/Concrete breaking (approx.) |
Lm |
600 |
|
|
|
Surface Restoration (approx.) |
Lm |
600 |
|
|
|
|
SUB-TOTAL |
|
||
II. FOR POLARIS SUBDIVISION |
|||||
|
Supply/Installation of 100 mm Ø UPVC Pipes, Class 150 (approx.), (Depth = 0.8 meter, Width = 0.4 meter) |
Lm |
480 |
|
|
|
Supply/Installation of 50 mm Ø UPVC Pipes, Class 150 (approx.), (Depth = 0.8 meter, Width = 0.3 meter) |
Lm |
672 |
|
|
|
Supply/Installation of CI Gate Valve M/M 100 mm Ø |
Lot |
1 |
|
|
|
Supply/Installation of CI Gate Valve M/M 50 mm Ø |
Lots |
2 |
|
|
|
Replacement of ACP Tee 6” Ø (CI Tee 100 mm M/M) |
Lots |
2 |
|
|
|
Replacement of ACP Tee 6” Ø (CI Tee Reducer 100 mm x 50 mm M/M) |
Lots |
2 |
|
|
|
Replacement of ACP Tee 6” Ø (CI Tee 50 mm M/M) |
Lots |
9 |
|
|
|
Replacement of ACP Elbow 6” Ø w/ fittings |
Lot |
1 |
|
|
|
Demolition/Concrete breaking (approx.) |
Lm |
1152 |
|
|
|
Surface Restoration (approx.) |
Lm |
1152 |
|
|
|
|
SUB-TOTAL |
|
||
III. FOR MT VIEW RESORT SUBDIVISION |
|||||
|
Supply/Installation of 100 mm Ø UPVC Pipes, Class 150 (approx.), (Depth = 0.8 meter, Width = 0.4 meter) |
Lm |
300 |
|
|
|
Supply/Installation of CI Gate Valve M/M 100 mm Ø |
Lot |
1 |
|
|
|
Supply/Installation of CI Gate Valve M/M 50 mm Ø |
Lots |
3 |
|
|
|
Demolition/Concrete breaking (approx.) |
Lm |
300 |
|
|
|
Surface Restoration (approx.) |
Lm |
300 |
|
|
|
|
SUB-TOTAL |
|
||
|
|
|
|
|
|
|
All Bid Prices are Inclusive of Tax, Labor Costs, Installation Costs, Hauling Costs and Contingencies |
|
|
|
|
AMOUNT IN WORDS:
|
TOTAL BID PRICE
|
|
Prospective bidders should possess a valid PCAB License applicable to the contract, have completed a similar contract with a value of at least 50% of the ABC, and have key personnel and equipment (listed in the Eligibility Forms) available for the prosecution of the contract. The BAC will use non-discretionary pass/fail criteria in the Eligibility Check/Screening as well as the Preliminary Examination of Bids. The BAC will conduct post-qualification of the lowest calculated bid.
All particulars relative to Eligibility Statement and Screening, Bid Security, Performance Security, Pre-Bidding Conference, Evaluation of Bids, Post-Qualification and Award of Contract shall be governed by the pertinent provisions of R.A. 9184 and its Implementing Rules and Regulation (IRR).
The schedule of BAC activities is as follows:
BAC Activities |
Schedule |
1. Issuance of Bid Documents |
September 28, 2018 |
2. Pre-bid Conference |
October 8, 2018 (10:00 am) |
3. Receipt and Opening of Bids |
October 22, 2018 (Submission-11am, Opening-1:00pm) |
The BAC will issue Bidding Documents to bidders upon payment of a non-refundable amount of _FIVE THOUSAND PESOS_ to the Mariveles Water District Cashier.
The Mariveles Water District reserves the right to accept or reject any bid, to annul the bidding process, and to reject all bids at any time prior to contract award, without thereby incurring any liability to the affected bidder or bidders.
For further information, please contact the BAC at our office located at P. Road, San Isidro, Mariveles, Bataan at Tel. No. (047) 935-46-35, Telefax # (047) 935-55-61.
ENG’R JOSEPH B. DELOS REYES
Noted by; BAC Chairman
CRISTINELA RUTH I. LAMAYRA
General Manager